E.Protect+ / Post-Applied Vertical
E.Protect+ is post applied to vertical concrete substrates and provides incomparable protection against hydrostatic conditions, chlorinated volatile organic compounds (VOCs), methane gas, and petroleum hydrocarbons. E.Protect+ is chosen due to its ease of application and time savings over traditional peel and stick systems and can be applied over green concrete. E.Protect+ combines three effective waterproofing systems into one to create the highest level of redundant below-grade building protection on the market.
System components are as follows:
* 80 mils of e.spray
* e.shield 110b, bentonite geocomposite
* e.drain 6000
Highlights
Redundant, with three layers of different waterproofing protection to create a composite system that is superior to the materials used on their own.
Provides the highest level of chemical resistance to a wide range of contaminants found in soil and groundwater.
It's seamless.
Complete mechanical bond to any concrete overlay.
Installs quickly over large areas, saving time and money for building owners.
Provides continuous active waterproofing protection thanks to the bentonite layer creating a uniform, self-sealing membrane.
Technical Resources
Architectural Drawings
1.143.1.3 E.PROFORMANCE UNDERSLAB ASSEMBLY - VERTICAL TRANSITION - E.PROTECT+ POST-APPLIED SYSTEM
PDF DWG3.340.1.1.01 E.Protect+ Shoring Wall Assembly - Wood Lagging - Transition to E.Proformance Deck Assembly
PDF DWG3.340.1.1.02 E.Protect+ Shoring Wall Assembly - Wood Lagging - Transition to E.Protect Deck Assembly
PDF DWG3.340.2.1 Shoring Wall Assembly - Wood Lagging - Transition to Deck Assembly with Concrete Topping
PDF DWG3.340.2.1.01 E.Protect+ Shoring Wall Assembly - Wood Lagging - Transition to E.Proformance Deck Assembly with Concrete Topping
PDF DWG3.340.2.1.02 E.Protect+ Shoring Wall Assembly - Wood Lagging - Transition to E.Protect Deck Assembly with Concrete Topping
PDF DWG3.340.3.1 Shoring Wall Assembly - Wood Lagging - Transition to Deck Assembly with Asphalt Topping
PDF DWG3.340.3.1.01 E.Protect+ Shoring Wall Assembly - Wood Lagging - Transition to E.Proformance Deck Assembly with Asphalt Topping
PDF DWG3.340.3.1.02 E.Protect+ Shoring Wall Assembly - Wood Lagging - Transition to E.Protect Deck Assembly with Asphalt Topping
PDF DWG3.340.4.1 Shoring Wall Assembly - Wood Lagging - Transition to Deck Assembly with Pedestal Pavers
PDF DWG3.340.4.1.01 E.Protect+ Shoring Wall Assembly - Wood Lagging - Transition to E.Proformance Deck Assembly with Pedestal Pavers
PDF DWG3.350.2.01 E.Protect+ Shoring Assembly Transition to E.Proformance Shoring Assembly w/Rock Pocket
PDF DWGBrochure & System Overviews
Pre-Built Submittals
Product Data Sheets
PDS e.adhesive
PDFPDS e.base 316
PDFPDS e.catalyst
PDFPDS e.drain
PDFPDS e.drain 12ds
PDFPDS e.drain 6000
PDFPDS e.fastener
PDFPDS e.hanger
PDFPDS e.poly
PDFPDS e.roll
PDFPDS e.shield 110b
PDFPDS e.spray
PDFPDS e.stop b
PDFPDS e.stop gu
PDFPDS e.stop hpl
PDFPDS e.tape
PDFPDS e.term hd
PDFPDS e.vent
PDFPDS PM Sealant
PDFSafety Data Sheets
SDS Calcium Chloride
PDFSDS e.adhesive
PDFSDS e.base 316
PDFSDS e.catalyst
PDFSDS e.cover tb
PDFSDS e.drain
PDFSDS e.drain 302
PDFSDS e.drain 990
PDFSDS e.poly
PDFSDS e.roll
PDFSDS e.shield 110b
PDFSDS e.shield 205b
PDFSDS e.shield bb
PDFSDS e.spray
PDFSDS e.stop b
PDFSDS e.stop gu
PDFSDS e.stop hpl
PDFSDS e.term af
PDFSDS e.term strip
PDFSDS e.trowel
PDFSDS Liquid Smoke
PDFSDS PM Sealant
PDFHave questions?
EPRO can help select the right system for your project conditions.Image Gallery
Related Systems
E.Protect
Redundant composite system that balances performance and budget considerations.
See Product Details