Blindside in Hollywood

Post Date: 
October 9, 2018

Blindside waterproofing systems are among the most difficult to design and install. These waterproofing and drainage systems are placed before the structural walls are poured, which means they must be installed over a soil retention system rather than concrete or masonry. That retention system—whether it be lagging beams, sheet pilings, shotcrete, or compacted native soils—is typically rough, uneven, and subsequently requires extensive detailing.

Additionally, blindside applications are usually part of massive projects that extend far below a water table where, in some cases, hydrostatic pressure can be extreme. Here, the workmanship must be flawless, as once the structural wall is in place, it is extremely difficult to repair any leaks that develop.

Read the full article at https://www.waterproofmag.com/2018/10/blindside-in-hollywood/

No single material should ever be relied upon to effectively waterproof a building or protect it from ground contamination. Rely on EPRO to ensure that your building remains dry and safe.

Submit your site conditions today and simplify the process with a no obligation assessment and recommendation from EPRO or Find a Local Rep in your area.