Pre-Applied Blindside Shoring

Shoring

When: Vertical protection against nuisance water, perched water, or groundwater.  Also used to protect against the lateral migration of various contaminated vapors and methane gas.

Designed for various shoring applications: soldier pile, back lagging, soil nail, internal rakers, secant walls and sheet pile. These systems are also compatible for use with shotcrete and poured walls.

E.Protect+ shoring assembly combines the redundant  benefits of e.drain 6000 (3/8” drain mat), e.base 316, (16 mil HDPE thermoplastic membrane with heat welded seams), a 80 mil layer of e.spray (polymer modified asphaltic membrane), and e.shield 205b (a HDPE reinforced bentonite sheet). E.Protect+ shoring assembly is designed to address hydrostatic conditions in zero-lot-line applications that present significant complexity and risk.

E.Protect shoring assembly utilizes e.drain 6000 (3/8″ drain mat), e.base 205 (geotextile reinforced HDPE sheet membrane), a 80 mil layer of e.spray (polymer modified asphaltic membrane), and e.shield 205b (a HDPE reinforced bentonite sheet). Ideal for excavations greater than 20 feet, post tension foundations, and shoring walls with less than ideal substrates.

E.Proformance shoring becomes fully integrated with the foundation wall by applying a 60 mil layer of e.spray (polymer modified asphaltic membrane) to e.drain (30 mil HDPE 3/8” dimpled drain mat). E.Proformance shoring assembly provides ideal waterproofing protection for structures without significant presence of water.

E.Protect+

When performance is paramount.

E.Protect

Ideal blend between performance and budget considerations.

E.Proformance

Proven systems for sites with lower risk.

Tell us more